A Practical Guide to Contractor Job Costing

What job costing answers, what it needs, and how to read the result.

Job costing means recording each job’s income and direct costs against that job, so you can see what the work earned before the costs of running the business. This guide explains the parts in plain terms, with one hypothetical example. It is general information, not advice for a particular business.

From JP Bookkeeping LLC · Downey · Serving Los Angeles and California

Questions about your own records? Jimmy Perez can look at them with you in a free evaluation. Meet Jimmy

A calculator, reading glasses, ring binders and printed charts on a desk
What it answers

What job costing answers

Recorded consistently, job costing answers a handful of practical questions:

  • Did this job cover its direct costs? Its recorded income compared with the materials, labor, subcontractors and other costs recorded against it.
  • Which kinds of job do better? Margins compared across jobs of different types or sizes, once each one is recorded the same way.
  • Where did the costs go? Costs by category within a job, showing whether materials, labor or subcontractors drove the result.
  • What is still missing? Costs not yet assigned, or bills not yet received, that would change a job’s figures.

It does not tell you whether the business as a whole made money, or how much cash is available. Those come from the profit and loss and from cash reporting; the example below shows how they connect.

What it needs

The information needed to assign a cost to a job

  • A job name or number, used the same way on estimates, tickets, bills and invoices
  • The date, vendor and amount of each cost
  • A cost category, such as materials, labor, subcontractors or equipment
  • A document that shows which job the cost belongs to: a ticket, delivery slip, bill or your note
  • For income, the invoice and the job it was issued for

Labor needs one more record

Wages reach a job only through a record of where the hours were worked, such as timesheets by job. The rate used to cost those hours, for example whether payroll taxes and benefits are included, is a method decision: make it once and apply it every time.

Direct costs and overhead

Direct costs versus overhead

A direct cost belongs to one job. Overhead is the cost of running the business. A few costs sit between the two, and those need a rule.

Typical costs and how they are usually treated
CostUsuallyWhy
Materials bought for a jobA direct cost of that jobThe ticket or bill traces it to one job.
Subcontractor billsA direct cost of the job namedThe work was done on that job.
Crew wages, with timesheets by jobA direct cost, by the agreed methodThe time records show where the hours went.
Equipment rented for a jobA direct cost of that jobIt was rented for, and used on, one job.
Office rent, insurance, software, accounting feesOverheadThey support the whole business.
Vehicle fuel, small tools, a supervisor’s time across jobsDepends on the method you chooseEither kept as overhead or spread across jobs by a rule. Choose once and apply it consistently.
Hypothetical example

A job margin is not business profit

Reading the example

Two jobs in the same quarter. Job A has $60,000 of recorded income and $45,000 of recorded direct costs: a $15,000 margin, 25% of its income. Job B has $25,000 of income and $22,500 of costs: a $2,500 margin, 10%. Together the jobs leave $17,500 before overhead.

The business also spent $14,000 on overhead in the quarter, so $3,500 is left, before any other items and taxes on the profit and loss. Both jobs were positive, yet the business result is far smaller than either margin suggests.

Now suppose a $3,000 subcontractor bill for Job B had not yet been entered. Once it is, Job B’s margin becomes −$500 and the result after overhead falls to $500. A job report is only as complete as the bills recorded against it.

Hypothetical example One quarter, accrual basis (income as invoiced, costs as billed). Not client data.
Job A margin ($60,000 − $45,000)$15,000
Job B margin ($25,000 − $22,500)$2,500
Combined job margin$17,500
Overhead for the quarter−$14,000
Left after overhead Before other items and taxes$3,500
Common problems

Common missing-record problems

Most unreliable job reports trace back to a few gaps in the records:

  • Tickets with no job on them

    The cost is real but cannot be placed. Writing the job on the ticket at the counter, or noting it the same day, prevents most of these.

  • Bills that arrive after the job looks finished

    A late subcontractor or supplier bill can turn a good-looking job into a loss, as in the example. Reports should say which period they cover, and open bills should be followed up.

  • Returns and credits never recorded

    A credit that is not entered leaves the job carrying material it gave back.

  • Labor with no time records by job

    Without them, wages cannot be assigned to jobs reliably, and job margins look better than they are.

  • Different names for the same job

    “Elm St”, “Elm Street remodel” and a job number on different documents become three jobs unless one convention is used.

  • Customer payments read as job results

    A payment shows cash coming in, not how the job is doing. Job reports prepared on an accrual basis, like the example above, count income when it is invoiced and apply each payment to its invoice; a cash-basis report counts income when it is received. Either way, the report should say which basis it uses so its figures are read correctly.

Putting it to work

How organized bookkeeping supports project reporting

Job costing sits on top of ordinary bookkeeping. If transactions are uncategorized or accounts unreconciled, job reports inherit the errors. The usual order is a file set up to identify jobs, records brought current where they are behind, consistent monthly bookkeeping, and then reporting by job.

Whether your software tracks projects, and on which plan, depends on the product and your subscription, and vendors change their plans; the job costing page describes how software supports project reporting as of its last review. Turning a feature on is not the same as having reliable job reports: each transaction still has to be assigned correctly.

Where JP Bookkeeping fits

Setup and conversion prepares a file that can identify jobs, cleanup and catch-up brings records current, monthly bookkeeping keeps them that way, and job costing and financial reporting adds agreed reports by job. Work-in-progress schedules, percentage-of-completion accounting and retainage accounting are not part of these services.

Your next step

Want job reports you can rely on?

Start with a free evaluation of your bookkeeping needs.

Call (323) 816-0517Free Evaluation (opens in a new tab)